Project Cost | $140.18 Million |
Shareholder | CSE 100% |
Installed Capacity | 54 MW |
Average Annual Energy | 204 GWh |
Maximum Turbine Discharge | 60.9 m3/s |
Rated Head | 100.7 m |
Turbine Type | Vertical Francis x 3 Units |
Offtaker | EDL |
Catchment Area | 646 Km2 |
Annual Average Rain Fall | 2,576 mm |
Annual Average Discharge | 28.9 m3/s |
Reservoir Storage Capacity | 471 Million m3 |
Reservoir Surface Area | 32 Km2 |
Full Supply Level | 541.8 m a.s.l |
Minimum Operating Level | 521.0 m a.s.l |
TECHNICAL STRUCTURE
Main Dam
Type | Gated concrete gravity (RCC) |
Maximum height | 65 m |
Crest Length | 494 m |
Crest elevation | 545 m a.s.l |
Full Supply Level (FSL) | 541,80 m a.s.l |
Minimum Operation Level (MOL) | 521,00 m a.s.l |
Free Support And Updates
When she reached the first hills of the Italic Mountains, she had a last view back on the skyline of her she had a last view back on the skyline of her hometown Bookmarksgrove, the headline of Alphabet Village and the subline of her own road, the Line Lane
Top 1 free drag and drop page builder
When she reached the first hills of the Italic Mountains, she had a last view back on the skyline of her she had a last view back on the skyline of her hometown Bookmarksgrove, the headline of Alphabet Village and the subline of her own road, the Line Lane
A New Higher Performance UI
When she reached the first hills of the Italic Mountains, she had a last view back on the skyline of her she had a last view back on the skyline of her hometown Bookmarksgrove, the headline of Alphabet Village and the subline of her own road, the Line Lane
New Accordion Tab
HYDRO-ELECTRO-MECHANICAL INFORMATION
Powerhouse
Type | Gated concrete gravity (RCC) |
Maximum height | 65 m |
Crest Length | 494 m |
Crest elevation | 545 m a.s.l |
Full Supply Level (FSL) | 541,80 m a.s.l |
Minimum Operation Level (MOL) | 521,00 m a.s.l |
Free Support And Updates
When she reached the first hills of the Italic Mountains, she had a last view back on the skyline of her she had a last view back on the skyline of her hometown Bookmarksgrove, the headline of Alphabet Village and the subline of her own road, the Line Lane
Top 1 free drag and drop page builder
When she reached the first hills of the Italic Mountains, she had a last view back on the skyline of her she had a last view back on the skyline of her hometown Bookmarksgrove, the headline of Alphabet Village and the subline of her own road, the Line Lane
A New Higher Performance UI
When she reached the first hills of the Italic Mountains, she had a last view back on the skyline of her she had a last view back on the skyline of her hometown Bookmarksgrove, the headline of Alphabet Village and the subline of her own road, the Line Lane